Replacing a lead or galvanized water service line involves more than simply installing a new pipe. The process typically includes verifying the existing service material, reviewing municipal requirements, obtaining permits and approvals, coordinating the replacement, completing inspections, and submitting reimbursement documentation when assistance is available.
Confirm whether the public side, private side, or both contain lead or galvanized material.
Determine whether reimbursement, cost-sharing, financing, or municipality-funded replacement may be available.
Contractor estimates, applications, owner signatures, and supporting documents may be required before approval.
Required plumbing permits, inspections, JULIE/utility locates, and municipal coordination are completed before construction.

A new service line may be installed using directional boring or another trenchless method that reduces excavation across the property.
Best when:

Traditional excavation may be required when access, soil conditions, utility conflicts, connections, or municipal requirements prevent trenchless installation.
Best when:
Connection point where the individual water service attaches to the municipal water main.
Service piping running from the water main to the B-box or curb stop.
Exterior shutoff that commonly separates the public and private portions of the water service.
Service piping running from the B-box or curb stop across the property toward the home.
Point where the new water service enters the building through the foundation wall.
Connection of the new service line to the water meter and interior plumbing.
Public and private responsibility can vary by municipality. The B-box or curb stop is commonly used as the dividing point, but local program rules should always be confirmed.
The physical replacement itself may often be completed in a single working day for a straightforward residential property, but the full process can take longer because of applications, contractor estimates, permits, utility locates, municipal approvals, inspections, and reimbursement processing.
Several days to several weeks depending on municipality.
Often approximately one working day for straightforward properties.
Timing varies based on municipal processing requirements.
Many Illinois reimbursement programs require written approval before construction begins. Starting work early can make an otherwise qualifying project ineligible for reimbursement.
Tell us the property address and municipality. We can help identify the service-line program, explain the required paperwork, and outline the next steps before construction begins.